Frequently Asked Questions
Here are answers to some common questions we often get asked.
Airtightness Testing FAQ
Yes they are – but this should be by designed ventilation which is controllable so it enables the occupant to choose when to let the warm air out.
New Build SAP & EPC FAQ
The EPC is produced when the property is finished it will be based on the final SAP calculations allowing for any changes to the design during the construction phase.
It’s not necessary to carry out a site inspection, the assessment is based on drawings and construction specifications provided by the developer. Although if we carry out the airtightness testing we can record some of the details whilst we are there.
EPC’s can generally be done within a few days after the airtightness test is carried out. However, it is necessary to obtain evidence to support the final specifications that will satisfy a Quality Assurance audit by the accreditation scheme.
Existing Building EPC FAQ
The inspection is a visual record of the features of the property. It will require full access to the property and surrounding area and involve measuring dimensions, recording relevant details and taking photographs.